Projects
Member of the expert panel to accompany the excavation process. Twin tube high speed rail tunnel in complex geology, with partly low overburden in urban area (l=13.8 km).
← Projects
Neuenschwander Consulting Engineers SAViale Stazione 4CH-6500 Bellinzona
Tel. +41 91 210 47 77
Fax +41 91 210 47 78
info@neu-ce.ch